A SIDE TRACK BETWEEN DEKANI STATION AND BIVJE HUB

Railway infrastructure A SIDE TRACK BETWEEN DEKANI STATION AND BIVJE HUB

The new 1.2 km track between the Koper railway station and the Dekani substation area, where the siding (turn-out track) is connected to the existing track, allows more flexible train traffic control and increased capacity of the existing Divača–Koper railway line.

In addition to the construction of the side track, the project included the construction of a bridge over the River Rižana, 2 underpasses, 4 culverts, and the Hrastovlje substation, as well as the installation of equipment, signalling-safety and telecommunications equipment, and the ETCS system.

 

THE SIDE TRACK REPRESENTS THE FIRST
KILOMETRE OF THE SECOND TRACK BETWEEN DIVAČA
AND KOPER.

Type of project:New construction/reconstruction
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency
Status:Completed

Bivje

Bivje

Related projects

UPGRADE OF THE MARIBOR–ŠENTILJ–STATE BORDER RAILWAY LINE

Type of project: Upgrade and new construction of the Počehova–Pesnica section
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency

A SIDE TRACK BETWEEN DEKANI STATION AND BIVJE HUB

Type of project: New construction/reconstruction
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency

LJUBLJANA RAILWAY STATION

Type of project: New construction
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency