DEPARTMENT OF INFECTIOUS DISEASES OF THE MARIBOR UNIVERSITY MEDICAL CENTRE
The new replacement construction of the Department of Infectious Diseases and Febrile Conditions will be built on the site of the existing building dating back 100 years, which will be demolished for this purpose.
The new building will have 3 basements+ground floor+6 new levels and will have a total of 77 beds or 118 beds if single rooms are used as double rooms.
The investment will be carried out at the level of a nearly zero-energy building. Investing in energy-saving, low-carbon, and energy-efficient buildings in this way contributes to a faster transformation towards a carbon-free society.
MODERN FACILITIES WILL BE SPECIALLY
ADAPTED FOR DEALING WITH INFECTIOUS DISEASES.