EASTERN TUNNEL TUBE OF THE KARAVANKE MOTORWAY TUNNEL

Road infrastructure EASTERN TUNNEL TUBE OF THE KARAVANKE MOTORWAY TUNNEL

The total length of the new eastern tunnel tube of the Slovenian-Austrian Karavanke motorway tunnel will be 7,948 m. On the Slovenian side, the tunnel will be 3,546 m long, including 3,446 m of underground construction and 100 m of construction gallery.

In addition to the eastern tube, there will be additional construction for the building at the tunnel entrance, the 620 m of missing motorway, which will connect to the existing motorway in the area of the Hrušica toll station, will be built; there will be 3 bridges, 2 retaining walls, and a support wall. A helipad will be constructed in the area of the platform.

450,000 M3 WILL BE EXCAVATED DURING THE CONSTRUCTION OF THE TUNNEL, I.E. ENOUGH MATERIAL TO FILL 171 OLYMPIC SWIMMING POOLS.

Type of project:New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.
Status:In progress

VZHODNA CEV AVTOCESTNEGA PREDORA KARAVANKE

VZHODNA CEV AVTOCESTNEGA PREDORA KARAVANKE

Related projects

Harmonisation of road technical guidelines in the Republic of Serbia

Type of project: Technical documentation
Client: Javno preduzeće Putevi Srbije d.o.o.

THIRD DEVELOPMENT AXIS – SOUTH

Type of project: New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.

Management system for electrical and mechanical equipment in tunnels

Type of project: Pavement management
Client: Motorway Company of the Republic of Slovenia, DARS d.d.