SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Road infrastructure SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Within the supercontrol of the works performed in Corridor X, random checks were used to verify whether works are carried out in accordance with the technical specifications and standards set forth in the construction contracts.

Checks were based on visual inspections of the works performed, a laboratory analysis of asphalt and concrete samples collected, and on the basis of reviewing the documentation proving the quality of the work performed.

WORK WAS CARRIED OUT ON CORRIDOR X, ON THE TWO MOTORWAY SECTIONS LEADING TO NORTH MACEDONIA AND BULGARIA.

Type of project:New construction
Client: Koridori Srbije d.o.o.
Status:Completed

Related projects

BETIN INTERSECTION ON THE BLED SOUTH BYPASS ROAD

Type of project: New construction
Client: The Ministry of Infrastructure, the Slovenian Infrastructure Agency, and the Municipality of Bled

Sarajevo Bypass - Lot 1

Type of project: New construction
Client: Javno preduzeće Ceste Federacije BiH, d.o.o.

Reconstruction of national road pavements

Type of project: Reconstruction
Client: The Ministry of Infrastructure, Slovenian Infrastructure Agency