On Friday, 15 May, DRI concluded two new contracts with Slovenian Water Agency related to the project of flood protection regulation of the Gradaščica river basin - for Stages 1A and 2.
Today, a contract was concluded between DRI and 2TDK for "Supervision services and health and safety coordination during the construction of bridging structures across the Glinščica valley for the second track of the Divača - Koper railway line."