HOTEL MAESTOSO LIPICA

Buildings HOTEL MAESTOSO LIPICA

The Maestoso Hotel was built in the 1970s and partly renovated in the late 1990s. The hotel was fully renovated in 2021, thus increasing accommodation capacities.

Only the load-bearing structure of the existing hotel was preserved; a new accommodation wing was additionally built, while one additional level was added to the two existing ones. In addition to the renovation of the building, energy renewal was carried out.

The hotel now has 139 rooms, while the common area includes the reception desk and a bar, two restaurants, a convention hall, a kitchen, and other service and technical facilities. The hotel exterior has also been addressed, with the addition of green surfaces and access areas.

THE MAESTOSO HOTEL IS LOCATED ON THE LIPICA STUD FARM, WHERE LIPIZZANER BREEDING HAS BEEN CARRIED OUT FOR MORE THAN 400 YEARS.

Type of project:Renovation
Client: Holding Kobilarna Lipica
Status:Completed

HOTEL MAESTOSO LIPICA

HOTEL MAESTOSO LIPICA

Related projects

Energy efficiency of public buildings

Type of project: Systemic and technical bases
Client: Ministry of Infrastructure

Zlatorog Villa Bled

Type of project: Rennovation
Client: The Secretariat-General of the Government of the Republic of Slovenia

DEPARTMENT OF ONCOLOGY, MARIBOR UNIVERSITY MEDICAL CENTRE

Type of project: Adding levels and extension
Client: The Ministry of Health, the Office for Control, Quality and Investments in Healthcare of the Republic of Slovenia