SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA
Within the supercontrol of the works performed in Corridor X, random checks were used to verify whether works are carried out in accordance with the technical specifications and standards set forth in the construction contracts.
Checks were based on visual inspections of the works performed, a laboratory analysis of asphalt and concrete samples collected, and on the basis of reviewing the documentation proving the quality of the work performed.
WORK WAS CARRIED OUT ON CORRIDOR X, ON THE TWO MOTORWAY SECTIONS LEADING TO NORTH MACEDONIA AND BULGARIA.