SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Road infrastructure SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Within the supercontrol of the works performed in Corridor X, random checks were used to verify whether works are carried out in accordance with the technical specifications and standards set forth in the construction contracts.

Checks were based on visual inspections of the works performed, a laboratory analysis of asphalt and concrete samples collected, and on the basis of reviewing the documentation proving the quality of the work performed.

WORK WAS CARRIED OUT ON CORRIDOR X, ON THE TWO MOTORWAY SECTIONS LEADING TO NORTH MACEDONIA AND BULGARIA.

Type of project:New construction
Client: Koridori Srbije d.o.o.
Status:Completed

Related projects

THIRD DEVELOPMENT AXIS – NORTH

Type of project:
Client: Motorway Company in the Republic of Slovenia, DARS d.d.

Rehabilitation of damage and other dangerous points

Type of project: Rehabilitation
Client: The Ministry of Infrastructure, Slovenian Infrastructure Agency

MARKOVCI–GORIŠNICA–ORMOŽ MAIN ROAD

Type of project: New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.