BERTOKI, ŠKOFIJE, AND HRVATINI SEWERAGE NETWORK
In the populated areas of Bertoki, Škofije, and Hrvatini, the missing part of the sewerage network is still under construction, comprising 25 km of sewers, 4 km of storm water sewers, 14 pumping stations, and part of a replacement water pipeline.
After construction, 1657 people and 497 activity units will be connected to the network for draining municipal and rainwater, which will ensure 98% coverage by the public sewage system in these areas. The use of 378 septic tanks and 81 small municipal treatment plants will be discontinued.
AFTER CONSTRUCTION, THE SEWERAGE NETWORK COVERAGE WILL BE 98%.