Central waste water treatment plant Ptuj

Public utility and water infrastructure Central waste water treatment plant Ptuj

The wastewater treatment plant in Ptuj is intended for the treatment of urban waste water from the city of Ptuj, municipal waste water from households and industry in the city, and previously treated waste water from the factory Perutnina Ptuj d.d.

The plant comprise the inflow pumping station with overflow, sand chamber, coarse and fine electromotive screen, an aerated  grit chamber and grease separator, grease collection shaft, two distribution tanks, sequention basins, compressor station, sludge thickener and sludge storage tank, reception place for sludge from small waste water treatment plants and auxiliary facilities. The project was co-financed by the European Union.

The capacity of waste water treatment plant will be 68,000 population equivalents.

Type of project:New construction
Client: City of Ptuj
Status:Completed

Related projects

FLOOD PROTECTION MEASURES ON THE RIGHT BANK OF THE RIVER SAVINJA IN PARIŽLJE

Type of project: Ensuring Flood Safety
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency

WASTE WATER COLLECTION AND TREATMENT IN THE AREA OF THE LJUBLJANSKO POLJE AQUIFER

Type of project: New construction
Client: City of Ljubljana, Municipality of Medvode and Municipality of Vodice

LJUBLJANA CENTRAL WASTEWATER TREATMENT PLANT

Type of project: Upgrade
Client: City of Ljubljana