FLOOD PROTECTION MEASURES ON THE RIGHT BANK OF THE RIVER SAVINJA IN PARIŽLJE

Public utility and water infrastructure FLOOD PROTECTION MEASURES ON THE RIGHT BANK OF THE RIVER SAVINJA IN PARIŽLJE

Flood protection measures safeguard the residents of Parižlje, a village on the right bank of the Savinja River, from rising waters. The Savinja River frequently floods, causing damage, and the intensity and frequency of these floods are increasing due to climate change. 

Flood protection measures on the right bank of the Savinja River in Parižlje, under the Polzela Bridge, included approximately 800 meters of water management works. These included the widening of the bank and securing it with a stone embankment, selectively cutting riparian vegetation, removing debris, and constructing of a stone-concrete wall.

PROTECTION MEASURES REDUCE THE FLOOD RISK.

Type of project:Ensuring Flood Safety
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency
Status:Completed

Related projects

FLOOD PROTECTION MEASURES ON THE RIGHT BANK OF THE RIVER SAVINJA IN PARIŽLJE

Type of project: Ensuring Flood Safety
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency

Deepening of the navigation channel in the Port of Koper

Type of project: Deepening of the navigation channel
Client: Luka Koper d.d.

Fishery pier in Koper

Type of project: Reconstruction
Client: City of Koper